Project Overview
Construction Site Generator — Cambodia was a strategic deployment of 6 x 150 kVA diesel generators for Construction operations in Cambodia.
| Parameter | Detail |
|---|---|
| Industry | Construction |
| Location | Cambodia |
| Generator Rating | 150 kVA |
| Quantity | 6 |
| Total Capacity | 900 kVA |
| Year of Installation | 2023 |
| Application | Standby / Prime Power |
The Challenge
Phnom Penh building construction. Basic site requirements. Cost-sensitive.
Our Solution
Installed 6 HQP-150GF Yuchai YC4D generators on skids. Simple operation. Fuel-efficient for extended operation. Local spare parts availability.
Equipment Delivered
| Equipment | Specification | Quantity | Notes |
|---|---|---|---|
| Generator | HQP-150GF, 150 kVA | 6 | Cost effective |
Results & Impact
The HuaQuan Power generator solution delivered measurable improvements:
| Metric | Before | After | Improvement |
|---|---|---|---|
| Uptime | 92% | 99%+ | +7% |
| Fuel Cost | Baseline | -25% | Optimized |
| Mobilization | 2 weeks | 3 days | Trailer |
| Downtime | 8 hrs/month | <2 hrs | -75% |
Key Takeaways
- Trailer-mounted generators enable rapid deployment and easy relocation between sites.
- Silent generators are mandatory for urban construction per municipal noise regulations.
- Dust and vibration protection extends construction generator service life significantly.
Frequently Asked Questions
Recommended Products for Construction
200 kVA Portable Generator | 300 kVA Trailer Generator | 500 kVA Silent Generator
Contact HuaQuan Power
hqgeneratorsale@huaquanpower.com
No. 11666 Guting Street, Weifang, Shandong, China
Shandong Huaquan Power Co., Ltd. — Since 2010